T400 Controller Facilities Manual
667/EB/20200/000 Page 8-5 Issue 9
Figure 8.2 - DELAY PHASE GAINING RIGHT-OF-WAY
GREEN......GREEN
E
AMBER
A
R/A
R/A
G
B
...Stage 3 or 5 Stage 1...(interstage - 6s)
Intergreen from Phase E to Phases A and G is 5 seconds.
Intergreen from Phase E to Phase B is 6 seconds.
(a)
(b)
AMBER R/A
Key:-
...RED...
E
AMBER
A
R/A
R/A
G
B
...Stage 3 Stage 1...(interstage - 5s)
Intergreen from Phase E to Phase B is 5 seconds.
E
AMBER
A
R/A
R/A
G
B
...Stage 5 Stage 1...(interstage - 6s)
Intergreen from Phase E to Phase B is still 5 seconds, but
Phase B is delayed by 1 second more than the intergreen.
(4 second phase delay plus 2 second red/amber = 6 seconds)
(c)