Siemens EH.75M.11. Especificaciones Pagina 24

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 308
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 23
T400 Controller Facilities Manual
667/EB/20200/000 Page 2-4 Issue 9
However, in other modes, namely CLF, UTC, Fixed Time, Priority, Part-Time, Manual
and Manual Step-On, the modes influence the outcome of the stage change algorithm.
This can be done by:
a) applying stage/phase prevents,
b) masking out phase demand,
c) inserting stage demands,
d) masking out extensions, i.e. causing them to be ignored,
e) Suspending maximum green times.
Thus for above-mentioned modes, specific stages may be requested, and the controller
forced to serve them when required.
2.5.2 Usage of Stage Movement Restriction Tables
The controller will always use the stage movement restriction table, applicable to the
mode in which it is operating when it initiates the stage change.
EXAMPLE
If a priority demand invokes a stage change, the controller will be in priority mode due
to the priority demand and will use the stage change restrictions table applicable to
priority mode.
However, if the controller has already decided to make a stage change in the VA mode
and a priority demand is received, the controller will continue to make the VA move
although the mode will have changed. The controller will then only use the stage
movement restriction table applicable to priority mode if it makes any subsequent
moves whilst still in priority mode.
2.6 PARALLEL STAGE STREAMING
2.6.1 General
Parallel Stage Streaming will provide independant control of up to 4 separate
intersections, later referred to as Streams, from one controller, i.e. the four
intersections may be considered as being controlled by separate controllers with the
exception of working in Manual mode, Part Time mode (see section 2.6.3), linked
fixed time and manual step on (see section 2.6.4).
This facility would normally be used if there are to be no cross-stream Phase Conflicts.
However, cross-stream Phase Conflicts and cross-stream Linking can be covered by
using either cross-stream Phase Intergreen or Special Conditioning Software.
2.6.2 Stage Streams
The controller will support up to 4 streams (numbered 0 to 3). Each stream may
contain any number of stages but no stage may appear in more than one stream and the
total number of stages for all streams must not exceed 16.
Vista de pagina 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 307 308

Comentarios a estos manuales

Sin comentarios