Siemens EH.75M.11. Especificaciones Pagina 296

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 308
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 295
T400 Controller Facilities Manual
667/EB/20200/000 Page 25-25 Issue 9
(C12) LMU Moves Array (PROM item - LMUMOV)
This is an existing config PROM item which is used by both the original RLM facility
and enhanced RLM operation. It comprises a 16 word array and defines for each stage
to stage move whether the RLM delays are to be applied or not.
25.4.6 Configuration Considerations
25.4.6(a) All-red Stages
When stage to stage moves are made via an intermediate all-red stage, the RLM phase
offset delays will only be applied on the basis of the phase changes involved on the
move from the all-red stage to the target stage.
The all-red stage should include a dummy phase and then any required RLM delay time
offsets should be configured on changes between the dummy phase and the phases
appearing in the target stage.
25.4.6(b) Intermediate Stages
When stage to stage moves are made via an intermediate stage, the same
considerations apply as for the all-red stage. If no phases (either real phases or dummy
phases) are losing right-of-way on the change from the intermediate stage to the target
stage, then no RLM offset delays will be applied. To avoid this, a dummy phase should
be configured in the intermediate stage.
Vista de pagina 295
1 2 ... 291 292 293 294 295 296 297 298 299 300 301 ... 307 308

Comentarios a estos manuales

Sin comentarios