
Index-2
C
Cable
connecting modems, overview, 6-32
PROFIBUS-DP installations
attaching connector, 6-28
cable requirements, 6-22
equipment needed, 6-21
guidelines, 6-23
maximum line length, 6-22
media options, 6-20
sample system, 6-20
termination and bias, 6-24
termination guidelines, 6-24
termination schematics, 6-26
termination selection switch, 6-25
troubleshooting, 9-23
twisted pair, 6-20
resistance of line-to-line, 9-21
RS-485, measuring resistance, 9-21
Series 505 installations
cable requirements, 6-7
connecting drop line to CPU, 6-14
connecting drop line to RBC, 6-14
connecting trunk line to terminal block,
6-17
drop line, 6-5
equipment needed, 6-4
extending trunk line, 6-18
guidelines, 6-8
media options, 6-4
preparing drop line, 6-12
preparing trunk line, 6-16
proper termination, 6-15, 6-18
selecting cable, 6-6
terminal blocks, 6-4
trunk line, 6-5
twisted pair, 6-4
Cable routing
back of 575 unit, 2-20
guidelines, 6-2
in-ceiling, 6-3
mounting tap, 6-4
surface duct, 6-3
terminal block, 6-4
under-floor, 6-3
Checksum error handling, F-2–F-3
Circuit breakers, guidelines for, 2-11
COM PROFIBUS, 1-11, 5-24
setting RBC parameters, 5-24
Communication, establishing, 4-45
Communication ports
CPU
545/555, 3-24
575, 4-47
RBC
PROFIBUS-DP, 5-5
Series 505, 5-5
Configuration
CPU, 575 primary and secondaries, 4-26
RBC, PROFIBUS-DP, 5-24
software
COM PROFIBUS, 1-11, 5-24
SoftShop, 1-11
TISOFT, 1-11
Configuring CPU for program storage, 7-6–7-9
Connectors
J1 backplane pin assignments, 4-54
J2 backplane on VMEbus base, 4-56–4-59
Coprocessor, installing, 4-23
CPU models
compatibility with I/O modules, B-7
described in manual, 1-2
D
Daisy chain
cable layout, PROFIBUS-DP, 6-23
switches, VMEbus backplane, 4-41
VMEbus signals, 4-53
Dipswitches
annex card, 575 CPU, 4-28
back-up battery switch, 3-22
backplane, 575 CPU, 4-41
base address, 575 CPU, 4-27
baud rates
CPU
545/555, 3-23
575, 4-25
RBC
PROFIBUS-DP, 5-17
Series 505, 5-8
comm ports, selecting, 3-24
Comentarios a estos manuales