
Page 82 HydroRanger 200 – INSTRUCTION MANUAL 7ML19981FC01
mmmmm
Testing the Configuration
Monitor system performance carefully, under all anticipated operating conditions.
1. When the HydroRanger 200 performs exactly as required, programming is complete.
2. If alternate Reading units, Failsafe action, or relay operation is desired, update the
parameters for the new functionality.
3. If the system performance experiences problems, see
General Appendix C:
Troubleshooting
, on page 218.
If you cannot observe all possible operating conditions during the System Performance
Evaluation, use the level simulation (see page 79) to verify programming.
When a simulation is run, alarm relays will react to the simulated level changes, but
control relays will not react. You can set P000 to value –1 to trigger the control relays
based on the simulated level.
Retest the system every time any control parameters are adjusted.
Comentarios a estos manuales