
1P
252 Expansion
1P 240
9.3
Configuring
—
When configuring the
1P
252 closed-loop control module, YOU must
W
the
configuring switches —
for speed measurement so that the actual count is interrogated by the
1P
240. Furthermore,
during initialization the 1/0 address and the assigned channel of the
1P
240 must also be specified.
The
1P
240 is configured by calling function block FB 173 in restart organization blocks OB21 and
OB22. In this mode, both channels are configured simultaneously; a second mode on the
1P
240 is
therefore not possible.
S5-I
15U
Branch 10
ADR.K
e.g. 160.1
Address:
160
Channel:
1
s 10.4=1
s
10.1=1
1P
252
1P
240
Function block
FB 173
STRU.
252
BGAD e. g. 160
Address: 160
S1O.4
*
:.:.:,
:,.:::::::::::::::::::
.:,
;,,
,’:.
:,:,:::,::;::::,;:
.,.
:;:’
+
:.:::,:::,.,.,,:,:,
DBNR
,-:’:..,...,.:.:.:.:.:.,.:.:
Slo.1
PAFE
Fig. 9-5. Configuring the Modules
Note
In
1P
252
expansion mode, the input signals are processed as for position decoding.
See Chapter 13 for information on encoder signals and Section 7.2.1 for infor-
mation on the direction of rotation (direction of counting).
9-4
EWA4NEB8116120-02a
Comentarios a estos manuales