
Commissioning and optimization (software)
7.3 Commissioning and optimization of the drive application
ET 200pro FC
Operating Instructions, 11/2007, A5E01100763B AA
91
7.3 Commissioning and optimization of the drive application
After the motor and converter combination is commissioned by quick commissioning,
parameters must be adapted and set to suit the requirements of the specific application.
Note
According to the factory setting, parameter changes are saved in the volatile memory (RAM)
of the converter. One of the following options can be used for saving the changes to
EEPROM:
• Set P0014 = 1: all changes are then saved immediately to EEPROM
• Trigger transfer from RAM to EEPROM via P0971 = 1
or via the STARTER button
.
The duration of the data transfer depends on the number of parameters changed. In some
cases it can take up to 3 minutes.
When using STARTER, the transfer is indicated by a progress bar. A dialog field announces
when transfer is successful.
The
List Manual
contains detailed parameter descriptions.
General settings
Parameters Description (parameter name and factory setting in bold) Setting
P0290 = 2 Converter overload behavior
Specifies the converter's response to internal overheating.
0: Reduce output frequency
1: Shut down (F00004)
2: Reduce pulse frequency and output frequency
3: Reduce pulse frequency, then shut down (F00004)
P0335 = 0 Motor cooling (enter the motor's cooling system)
0: Self-cooling using fan attached to the motor, mounted on the shaft
1: Separate cooling by means of a separately-driven cooling fan
2: Self-cooling and internal fan
3: Separate cooling and internal fan
Comentarios a estos manuales