WARNING
All the data interfaces, including the digital and analog interfaces, are reinitialized for the
series commissioning. This will interfere temporarily with data transfer or will cause the
digital outputs to switch over.
Before embarking on series commissioning, you must secure any dangerous loads.
To do this, proceed as follows:
• Lower the load to the ground or
• Secure the load using the motor holding brake.
Standard commissioning sequence with STARTER
1. Configure all frequency converters to be involved in standard commissioning with the
same application ID.
2. Commission the first frequency converter.
3. Upload from frequency converter to the PC: Frequency converter parameters are saved
on the PC.
4. Download from PC to the frequency converter: The saved parameters are transferred to
other frequency converters.
Note
In the case of a download with STARTER, all the necessary parameters (with the
exception of fail-safe parameters) will be downloaded to the frequency converter.
See also
Parameter transfer with PC (STARTER) (Page 129)
Standard commissioning sequence with MMC
1. Configure all frequency converters to be involved in standard commissioning with the
same application ID.
2. Commission the first frequency converter.
3. Upload from frequency converter to an MMC: Frequency converter parameters are saved
on an MMC.
4. Download from an MMC to the frequency converter: The saved parameters are
transferred to other frequency converters. The download can be performed manually or
automatically.
Note
In the case of a manual download, all the necessary parameters (with the exception of
fail-safe parameters) will be downloaded to the frequency converter.