
Series commissioning and operation
8.1 Transfer of the frequency converter parameter assignment
ET 200pro FC
130 Operating Instructions, 11/2007, A5E01100763B AA
Prerequisites
● The download converter's power supply must be connected.
● The download converter is in the "Ready to run" state.
Connect the STARTER PC to the download frequency converter via RS232 (point-to-point
connection, appropriate connecting cable required) or via fieldbus, press the online button
and perform the download using the ("Download project to target system") button.
The transferred parameters must then be saved in the frequency converter so that they are
powerfail-proof by pressing the
("RAM to ROM") button.
Remark
An online connection can only be established between the PC and frequency converter via
fieldbus if the following conditions are met:
● The interface module of the ET 200 station is running in DPV1 mode.
● The PC must be connected to the fieldbus directly.
See also
Series commissioning (Page 134)
8.1.5 Parameter transfer with PLC
Parameters can be uploaded and downloaded via fieldbus using the transfer mechanisms of
data set 47. For detailed information, refer to "Commissioning and Optimization".
Comentarios a estos manuales