Mounting the Analyzer
Instructions
The following procedures should be used to mount the Maxum II to wall or bulkhead; see Figure 2-1.
Maxum II Outline Drawing on page
16.
WARNING Prior to wall mounting and without the sampling
system, the Maxum II will weigh a minimum of 170 pounds
(77 kg). To mount the Maxum II to the wall, use a mechanical
lift or the number of people specified in the user’s policy on
lifting and installing.
CAUTION The Maxum II should be lifted only by the mounting
brackets on the back or supported from the bottom (be sure to
protect any bottom connections). Never allow the analyzer to
be supported on its side or front. It can be moved in either the
horizontal or vertical position.
Pre-installation Requirements
Before installing the Maxum II to the wall, the following requirements
should be followed:
Determine the suitable height from the floor to allow easy access to front and internal components.
Locate the Maxum II in a position that allows easy access to primary AC power wiring, I/O, stainless
steel tubing connections, carrier gas and compressed air supplies, and connection of any peripheral
devices within the house or shelter.
The Maxum II does not have a power switch. Install a circuit breaker near the unit (or power switch
with a fuse) with a rating of at least 20A is required for 115V and 16A for 230V. Refer to the
Application Drawing Package for specific information on the utility requirements.
CAUTION Installation regulations require the use of a ground fault interrupt (GFI) in the power
supply line.
More Information
Application Drawing Package; Dimensional Diagram - Analyzer sheet.
CE Installations Requirements page
17.
Wall Mounting Units
The following minimum specifications must be adhered to when wall mounting the Maxum II.
Left side clearance: 18" (460 mm) from wall or other equipment
Right side clearance: 18” (460 mm) in all cases
Front side clearance: 25 ¾” (654 mm) in all cases
Center to center: 44” (1120 mm) in all cases