
Guidelines for Installing Networked Automation Systems in Buildings
7-35
SIMATIC NET Twisted-Pair and Fiber-Optic Networks
C79000-G8976-C125-02
7.10 Installing and Wiring up the FC Outlet RJ-45
Components of the Industrial Ethernet FastConnect System
With the Industrial Ethernet FastConnect System, you can greatly reduce the time
required for installation and the sources of error during installation of LAN cabling.
The FC system consists of three components:
S IE FC Outlet RJ-45 with RJ-45 LAN jack and piercing terminal contacts for
connecting the RJ-45 connector technology with the FC cable in an industrial
environment
S Cat5 Plus certified fast installation cables with copper cores (IE TP FC
Standard Cable, IE TP FC Trailing Cable and IE TP FC Marine Cable)
S IE FC Stripping Tool, the preset stripping tool.
These three components are ideally matched and allow an FC installation cable to
be assembled within approximately two minutes.
DTEs or network components can be connected to the FC Outlet RJ-45 in a wiring
cubicle or in a control room using preassembled patch cables with RJ-45
connectors.
Comentarios a estos manuales