Siemens EF 83P Series Manual de instrucciones Pagina 79

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 113
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 78
5-7
5.4 Test-Cutting
5.4.1 Checklist before test-cutting
1) Make sure that the tool
holder is well locked
2) If the tool is well locked on
the tool holder.
3) If the cutting tool is also
tight locked.
4) If the jaws on the chuck
fixed steady.
5) The coolant in the coolant
tank needs to be enough.
Vista de pagina 78
1 2 ... 74 75 76 77 78 79 80 81 82 83 84 ... 112 113

Comentarios a estos manuales

Sin comentarios