1-5
Air Supply:
(1) Use only clean and dry air.
(2) Make sure that the air source can supply the specified
volume of air.
Installation:
(1) To hoist the machine, be sure to follow the precautions
bellow.
1) Only an authorized technician should perform work
with the machine hoistion.
2) Use only wires, shackles, and jigs of the dimensions
specified in the manual. They must be strong enough
to support the weight of the machine.
3) Before hoisting the machine, make sure that each of
the units is fixed securely.
4) Before hoisting the machine, make sure that each of
the units is fixed securely.
5) Be sure that the machine is well balanced both
lengthwise and crosswise while hoisting the machine
slightly shove the floor.
6) When a plurality of workers are in operation, be sure
to call attention each other as necessary.
(2) If rust prevention coating is applied to the slideway
surfaces, it must be removed completely. If any rust
prevention coating is left on the slideway when the
machine power is turned ON, a servo alarm will occur.
(3) The carriage and cross slide are fixed in place with transit
clamps when the machine is shipped. Also, eyebolts are
used to hoist the machine. These clamps and eyebolts
must be removed before turning ON the power.
(4) After installing the machine, the machine must be leveled.
The machine's crown and distortion values must be
adjusted according to the Accuracy Test Results Chart
delivered with the machine.
(5) Keep the door interlock switch in the ON position.
Remove the key and store it in a safe place.