Siemens EF 83P Series Manual de instrucciones Pagina 56

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 113
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 55
3-1
3.
Preparation before Machine setup
The place and transportation passage should be cleaned
completely before machine installed, and firm the foundation
base indeed, at the same time to ensure the machine accuracy
and life, you should consider the influence of the surrounding
to the machine to adopt the suitable measure to satisfy
"foundation requirement", "surrounding requirement", and
"power source requirement" to installation space.
3.1 Foundation Requirement
(1) When hook type foundation blot is required, please
contact with Leadwell for detailed information.
(2) The foundation base must be able to support load over 5
tons/m
2
.
(3) The below layout shows the area occupied by machine
and the location of foundation bolt and cable connection.
To ensure for safe maintenance in the future, the distance
between the machine body to the surrounding device
must be at least 500mm. Therefore the installation space
needs minimum 5300mm*2700mm*2400mm.
Vista de pagina 55
1 2 ... 51 52 53 54 55 56 57 58 59 60 61 ... 112 113

Comentarios a estos manuales

Sin comentarios