Siemens BTC-BR Manual Pagina 66

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 264
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 65
2 Removing and fitting housing cover
2–44 Section 2 © Siemens VDO Trading GmbH TU00-1318-0200302
2.11.7 n measuring system - Inserting spur gears
Fig. 2-39 Inserting spur gears
Modified since 09.92
Spur gear gearing increased from 0.5 mm to 3.5 mm.
Procedure
Push the n stylus lever (1) in the direction of the arrow (A) to the stop.
Insert the spur gear (2).
The drilled holes a (3) must be opposite one another.
Insert the spur gear (5).
The drilled holes b (6) must be opposite one another.
Insert the spur gear (7).
The drilled holes (6) must be opposite one another.
1 n stylus lever 5 Spur gear
2 Spur gear 6 Drilled holes
3 Drilled holes a 7 Gear
4 Drilled holes b
2
1
3
4
5
6
7
A
Vista de pagina 65
1 2 ... 61 62 63 64 65 66 67 68 69 70 71 ... 263 264

Comentarios a estos manuales

Sin comentarios