Siemens BTC-BR Manual Pagina 214

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 264
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 213
6 Additional equipment
6–14 Section 6 © Siemens VDO Trading GmbH TU00-1318-0200302
6.4.4 Checking recording
Fig. 6-11 Additional stylus - Checking and adjusting recording
Procedure
Insert
1
the adjustment disc.
Close the housing cover.
Supply voltage to connectors "D1" and "D2" and the negative pole to "A5".
The recording (1) must be between the circular arcs (3) and (5).
Adjusting
Using the adjustment tool correct the position of the stylus (6) in the direction
of arrow (a) or (c) or (b) or (d) (see Chapter4.1).
The stylus (6) must be aligned with the other styluses.
Supply voltage to "D1" only.
Check the recording (2) made.
The recording (2) must be between the circular arcs (9) and (10).
4 2
1 3
6
a
b
d
c
5
1 Recording 4 Circular arc
2 Recording 5 Circular arc
3 Circular arc 6 Stylus
1 1900.1501.054.030
Vista de pagina 213
1 2 ... 209 210 211 212 213 214 215 216 217 218 219 ... 263 264

Comentarios a estos manuales

Sin comentarios