Siemens SIMATIC TI500 Manual de usuario Pagina 40

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 94
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 39
Used only in quality
assurance tests by
manufacturer
Gateway Installation and Configuration
3-12
TIWAY I Gateway User Manual
3.4 Diagnostic
T
ests
The
Gateway has five levels of built-in tests, three of which are designed for
the user
.
Power
-on test
Operational Diagnostic test
User
-initiated test
Burn-in test
Final test
The Power
-on test executes the initialization routine following a master
reset. All indicators light for approximately one second before any subtests
begin. The only indicator which will be lit while the tests are running is the
TEST MODE indicator. If the Gateway passes all tests successfully
, the
GATEWA
Y GOOD indicator will light.
The subtests include a RAM data and address integrity test, a ROM CRC
integrity test, and a communications controller internal loopback test.
If the Gateway fails any of the power
-on tests, the GA
TEWA
Y GOOD
indicator will
flash.
The
Operational Diagnostic test executes during all normal modes of
Gateway operation, off-line or on-line. The subtests do not disturb normal
operation of the network. They are performed at least once per minute
under all conditions.
An operational diagnostics failure is treated in the same way as a power
-on
test failure. The GA
TEWA
Y GOOD indicator will
flash
if the Gateway fails
any diagnostic test.
Built-In Diagnostic
Tests
Power
-On T
est
Operational
Diagnostic T
est
Vista de pagina 39
1 2 ... 35 36 37 38 39 40 41 42 43 44 45 ... 93 94

Comentarios a estos manuales

Sin comentarios