Siemens CP 1515 Instrucciones de operaciones Pagina 28

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 104
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 27
Commissioning
Operating Instructions SCALANCE W 744-1PRO
28 C79000-G8976-C185-03
3.3.3 Assembling IE FC TP Standard Cable 4x2 GP or IE FC TP Flexible
Cable 4x2 GP with an IE IP67 Hybrid Connector
Remove the two inner shells of the univer-
sal sealing ring to adapt it to the diameter
of the hybrid cable.
Push the bushing, washer, adapted uni-
versal sealing ring and the housing over
the cable jacket.
Remove the following lengths of cable
jacket and shield braid:
25 mm for the power leads.
30 mm for the data leads
(to achieve good shielding, the shield
braid should be at least 30 mm long).
Arrange the data leads according to the
color codes on the splice element. The fol-
lowing table shows the assignment of the
data leads.
Wind the shield braid around the data
leads. As a result, the shielding of the ca-
ble has contact to the shield plate of the
splice element that will be fitted later.
Contact and color assignment of the splice
element.
Vista de pagina 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 103 104

Comentarios a estos manuales

Sin comentarios