Siemens CP 1515 Instrucciones de operaciones Pagina 24

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 104
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 23
Commissioning
Operating Instructions SCALANCE W 744-1PRO
24 C79000-G8976-C185-03
3.3.2 Assembling IE Hybrid Cable 2x2 + 4x0,34 with an IE IP67 Hybrid
Connector
Remove the two inner shells of the univer-
sal sealing ring to adapt it to the diameter of
the hybrid cable.
Push the bushing, washer, adapted univer-
sal sealing ring and the housing over the
cable jacket.
Remove the following lengths of cable jacket
and shield braid:
25 mm for the power leads.
30 mm jacket for the data leads (shorten the
braid by 11 mm).
Cut off the filler at the height of the cable
jacket.
Arrange the data leads according to the
color codes on the splice element. The fol-
lowing table shows the assignment of the
data leads.
Contact and color assignment of the splice
element.
Vista de pagina 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 103 104

Comentarios a estos manuales

Sin comentarios