
Siemens TCP/IP Ethernet Driver Help
3. Configure the desired number of PG/OP and PC (S7 Communication) connections.
Type Description
PG Communication Used for program loading, diagnostics
OP Communication Used for operator control and monitoring
S7 Standard
Communication
Communication connections not configured, MPI communications with PUT/GET
function blocks
S7 Communication (PC) Configured connections, data communications
Note:
The maximum number of PC connections for the CPU equals the Maximum Number of Connection Resources
minus the S7 Standard Communication resources minus the OP Communication resources minus the PG
Communication resources. Note that the Maximum Number of Connection Resources is based on the
CPU/version/firmware.
In the example shown above, there are six S7 communication (PC) connections available (12-4-1-1=6). Likewise,
the number of PG and OP connections can be increased using the same concept.
If the Device returned protocol [Class=0x83, Code=0x04] error is encountered, increase the number of S7
Standard Communication connections, thereby decreasing the number of S7 Communication connections.
4. After the connections have been configured, click OK. Next, in the main HW Config window click Station |
Save and Compile.
5. Click PLC | Download to commit to the changes.
How To Configure S7-1200 Connections with the Totally Integrated Automation
(TIA) Portal
to configure the S7-1200 for communications with the Siemens TCP/IP Ethernet Driver, an online connection is
required between the programming device and the target system. Users may have to configure the programming
device to talk to the target system. For more information, follow the instructions below.
www. kepware.com
31
Comentarios a estos manuales