Siemens SIMATIC Distributed I/O System DP/ASi Link Especificaciones Pagina 105

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 240
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 104
Wiring
5-19
Distributed I/O Device ET 200M
EWA-4NEB780600602-06
Wiring the Front Connector
Table 5-4 Wiring the front connector
Step 20-Pin Front Connector 40-Pin Front Connector
1. Thread the cable strain-relief assembly
into the front connector.
2. Do you want to bring the cables out at the bottom of the module?
If so:
Start with terminal 20, and wire the
terminals in the following order:
terminal 20, 19, ... 1.
Starting at terminal 40 or 20, wire the
terminals alternately (i.e. terminals 39,
19, 38, 18 etc. down to terminals 21
and 1).
If not:
Start with terminal 1, and wire the
terminals in the following order: terminal
1, 2, ... 20.
Starting at terminal 1 or 21, wire the
terminals alternately (i.e. terminals 2, 22,
3, 23 etc. up to terminals 20 and 40).
3. Also tighten the screws of any terminals that are not wired.
4. Thread the cable strain-relief assembly
into the front connector.
5. Pull the cable strain-relief assembly tight. Push the retainer on the strain-relief
assembly in to the left; this will improve utilization of the available space.
1
2
1
2
4
3
Vista de pagina 104
1 2 ... 100 101 102 103 104 105 106 107 108 109 110 ... 239 240

Comentarios a estos manuales

Sin comentarios