Siemens SIMATIC Distributed I/O System DP/ASi Link Especificaciones Pagina 106

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 240
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 105
Wiring
5-20
Distributed I/O Device ET 200M
EWA-4NEB780600602-06
Preparing the Signal Module for Operation
Table 5-5 Preparing the signal module for operation
Step 20-Pin Front Connector 40-Pin Front Connector
1. Press down the unlocking button on the
top of the module and, at the same time,
push the front connector into its
operating position on the module. When
the front connector reaches its operating
position, the unlocking button will snap
back into the locking position.
Tighten screws to bring front connector
to its operating position.
Note: When the front connector is put in its operating position, a front connector
encoding device engages. The front connector then only fits this type of module.
2. Close the front door.
3. Enter the addresses for identifying the individual channels on the labeling strip.
4. Slide the labeling strip into the guides on the front door.
ET0050
1a
2
1
Vista de pagina 105
1 2 ... 101 102 103 104 105 106 107 108 109 110 111 ... 239 240

Comentarios a estos manuales

Sin comentarios