Siemens GC..M.. Manual de usuario Pagina 13

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 12
GORATU MAQUINAS HERRAMIENTA,S.A.
GCM 4 / 5 / 6 / 8 / 10 11 JANUARY - 2011
20. STARTING UP AND COMMISSIONING
§ Customer request:
o Machine sitting following GORATU`s foundation instructions.
o Electrical connection following GORATU`s instructions.
o Air connection following GORATU`s instructions.
§ Machine visual inspection, in order to check any damage that may occur during
transport.
§ Check properly power supply and air connections (phase order and pressure).
§ Check properly good performance of machine:
o Movement of all axis.
o Spindle rotation / Orientation.
o Accessories / Auxiliary equipments.
o Gears / Refrigeration
§ Geometrical verification as per UNE standard specified for each type of machine.
§ Operation training:
o 1 Day (8 hours) for basic numerical control operation for standard machine
without options. Training course with following contents:
1. Control panel / CNC.
2. Axis movement / Reference setting.
3. Offsets calculation / work piece reference.
4. Edition / program selection.
5. Tool offset
6. Program transmission (PC CNC).
o Options:
1. Tool measuring probe. (2 hours).
2. Work piece measuring probe. (3 hours).
3. Digitalising probe. (6 hours).
4. Electronic dividing table. (1 hour).
5. Tool magazine. (1,5 hours).
21. VERIFICATIONS
§ The machine is geometrically verified in accordance with Geometrical verification
standard of GORATU, adaptation of Spanish standard UNE 15-302/90, from ISO 1984-
1982, and compendium of DIN 8615, part 3 and 4 relative to “verification conditions of
fixed bed height milling machine and mandrino in horizontal position and/or mandrino in
vertical”
§ Axis positioning verification is made by laser according to ISO 230-2 standard.
§ POSITIONING ACCURACY (mm)................................................................... A: 0,015 mm
§ REPEATABILITY (mm)....................................................................................R: 0,008 mm
(*) For X>3000 mm traverse, increase 0,005 mm. For each additional 1000 mm.
Vista de pagina 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 23 24

Comentarios a estos manuales

Sin comentarios