Siemens Advance Network Gateway Manual de usuario Pagina 28

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 72
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 27
DataNET Fiber Optic Connections, Continued
Installation
Instructions
Step Action
1. Ensure that the ANCB is installed in slot 1 of the SYSCON.
2. Connect the Fiber Optic cable, 10-pin connector to J12 on
the ANCB.
10-PIN FIBER
OPTIC
CONNECTOR
3. Route each of the other 6-pin connectors marked J1 and J2
through the holes drilled in the access plate and connect to
the Fiber Optic Coupler Assemblies. Mount the Fiber Optic
Coupler Assembly using the hardware that came with it.
18 Installation 2000592-001
Vista de pagina 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 71 72

Comentarios a estos manuales

Sin comentarios